Construction & Demoltion Debris per metric tonne (1,000 kg): $
Public Vehicle Minimum (Loads weighing less than 138 kg): $
Commerical Vehicle Minimum (Loads weighing less than kg): $
Inert Fill: Fee per metric tonne (1,000 kg)
Brick & Block: $ per metric tonne
Concrete: $ per metric tonne
Asphalt: $ per metric tonne
Fuel Recovery:
A fuel recovery fee may be applied to all waste disposal and transportation services provided, including but not limited to, pickup, transportation, and disposal of materials. The fee will be determined based on the cost of fuel at the time of service and will be calculated as a percentage of the total cost. The percentage will be determined by YORK1 and may be adjusted periodically to reflect changes in fuel costs. Please click here to review the fuel recovery details.
ACCEPTABLE ITEMS
Construction waste
Drywall, roofing shingles, cedar shake roofing, metal, cardboard, counters, tiles, flooring, carpet, wood, and pressure treated lumber.
Inert Fill
Residential dirt and sod, concrete, clay bricks, gravel, and brick.
Yard Waste
Trees, shrubs, landscape material and leaves.
wood
Clean wood.